LV AC and DC auxiliary power supplies and distribution.Lightning protection system in accordance with the design requirementsģ8kV internal substation works, including:.Post insulators, busbars, and connectors to complete the substation and connection to the WF substation side.CT’s for the protection and metering systems.Incoming cable terminations and support structures.The Contestable Works consisted of the design, supply, installation, testing and pre-commissioning of the following equipment:ģ8kV external substation works, including: Mainline completed the substation contestable works in accordance with the ESBN functional specifications, designs and material specifications and drawings issued by the Utility Company. Ballycumber WF was contestably built Substation. The WTGs are connected at 38kV to the ESBN distribution network at the point of connection via the grid transformer located at the WF substation (Ballycumber). Each WEC is capable of a maximum output of 3.2MW via a turbine transformer. The WF includes six Siemens SWT 101 3.2MW Wind Energy Converters (WEC’S) with a maximum installed capacity of 19.2MW and a maximum export capacity of 18MW. Date of Completion: July 2017 to April 2019īallycumber Wind Farm (WF) is located near Tinahealy, Co.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |